The project involved the construction of a new 164,000-sf renovation and addition for the existing school, including modification and reconstruction of the field areas, driveways, and parking areas. JTC performed a geotechnical investigation to obtain information on the subsurface condition at the high school. Our scope or services included the following:
- Subsurface exploration program
- Test borings
- Laboratory testing of soil samples
- Geotechnical investigation report
JTC was an integral part of supporting the suitability and sustainability of the project located partially within the Ottauquechee River Corridor.
