Chickley River Bridge Replacement

  • Charlemont, MA
  • Transportation
  • Geotechnical Engineering
Scroll

JTC performed designer services for different portions of the work on this project. The initial work included performing design calculations and providing procedural drawings for the demolition contractor. Our designs included review of crane loading and pick weights of deck and girder components for the preferred procedure.

JTC later performed engineering design for the pile foundation contractors pile testing program. We designed a heavily instrumented test pile and the load test frame.

JTC will also be on-site to inspect the fabrication of the test pile and setup of the load test.