The new Camden Rockport Middle School consists of the construction of a new $26.8M 83,000-sf three-level building including associated parking lot and bus loop; athletic fields and playground spaces; structural steel frame with composite beams; and fireproofing.
JTC’s scope of services includes: preconstruction testing; special inspections; fireproofing; cold form metal framing; concrete paving; air barrier adhesion testing; firestopping inspection; and slab moisture testing.
If you’d like to know more about us or wanted to get in touch, feel free to contact us.