JTC has project experience for a wide range of clientele; we pride ourselves on our skills and expertise applicable to diverse project scopes.
Preble Street Sewer Separation Phase 1
This project consisted of a sewer separation construction project located within Preble Street Extension and Marginal Way, including storm sewer pipes, various size manholes, CSO chamber modifications, trench paving, and other related construction. The goal… Continue reading
WWTF Disinfection Upgrade Project
JTC is providing on-site inspection services for this wastewater treatment facility disinfection upgrade project in Burlington, VT. Our Resident Engineer is serving as full-time resident project representative to assist Wright-Pierce (the Engineer) in observing the… Continue reading
Bradley International Airport Construct Taxiway E Project
JTC provided a geotechnical investigation that included subsurface investigations (cores, borings, and field CBR testing) and laboratory testing of existing pavement and subsurface materials. Subsurface investigations and associated testing procedures were in accordance with recommendations… Continue reading
Herring Passage and Smelt Habitat Restoration
The goals of this $2.7M Herring Passage and Smelt Habitat Restoration project were to: replace the existing fish diversion gate at the tunnel outlet with a more effective design that will prevent fish from entering… Continue reading
Sanford Schools Renovations
The City of Sanford embarked on an ambitious three year project to renovate three existing schools and reconfigure the school district by the fall of 2020. JTC’s scope of services included: preconstruction testing for subgrade,… Continue reading
Camden Rockport Middle School
The new Camden Rockport Middle School consists of the construction of a new $26.8M 83,000-sf three-level building including associated parking lot and bus loop; athletic fields and playground spaces; structural steel frame with composite beams;… Continue reading